Roadworks Season Kicks Off
More than 104 kilometres of Whangārei’s sealed roads will get fresh surfaces this summer, and one kilometre of new sealed road will be added.
Council has already started road upgrades and re-surfacing, making the most of the coming season of dryer weather and longer days.
Major roading projects have also kicked off for the summer roadworks season with Council widening Porowini Avenue Maunu Road intersections and the New Zealand Transport Agency working to improve the intersection of Tarewa Road and State Highway 1 near Tarewa Park.
Almost $40 million will be invested in transport maintenance and improvements between now and 1 July next year. This includes $1.1 million in road drainage improvements; $1.7 million to repair and replace structures; $3.8 million to rehabilitate sealed roads; $1.5m on shared paths, $2m on LED upgrades, $2m intersection improvements and just over $4.3 million of re-seals. Unsealed roads will also benefit from an $800,000 investment while $4.8 million of minor improvements will be completed across the network.
The rest of the work to be completed during the year, and over the next three years and decade is outlined in Council’s Long Term Plan.
Planned major roading projects include improvements to the southern entrance way to the city; the four-laning of Riverside Drive (2024-25); intersection improvements for One Tree Point Road (2021-22); and the upgrading of the intersection of Kioreroa Road and Port Road (2021-22).
Q: Why seal and re-seal?
The seal on a road is like paint on a house – it keeps the structure underneath dry, secure and sound.
But, like paint, it doesn’t last forever and requires maintenance and replacement to do its job properly.
Wear and tear, changes in temperature, rain and underlying ground conditions all mean the surface must be constantly maintained and repaired. There is no such thing as “once and for all” in the transport world.
Q: What if my road looks fine?
When the surface of a street starts to break down it is time to reseal. The ideal time to reseal is just before any damage occurs, so a road may still look to be in good condition. We aim to keep it that way.
Q: Didn’t they just do that bit?
Sometimes it can be frustrating to see road repairs happening in the same spots repeatedly. This is not because the road works are failing, it is because road surfaces are built in layers and that requires a number of repair stages be done in the right sequence.
Rather than doing all the stages in one spot, involving all the materials and equipment to be taken there, Council goes over the whole network doing one stage, then goes over again, doing the next stage and so on, until it is all done. It is more cost efficient this way.
Q: What is the chip seal process?
Minor repairs are carried out prior to resealing. The contractor will contact residents in the street about a week before work begins.
Hot bitumen is sprayed and stone sealing chips are spread and rolled in.
Excess sealing chips are swept away and road marking is reinstated a few days after sealing.
As many as three additional sweeps may follow in the next six months.
Sometimes contractors carry out staged repairs on roads one year, before the same section of road is resealed a year later.
Q: Why summer?
The drier months with longer days are better for building roads because the different layers that make up the roads stick better to each other when they can be kept dry. Longer daylight hours also mean more work can be done each day without lights, which is safer and less expensive.
🎄Let's get festive 🎄
If you've decked your halls with all things jolly, we think it deserves to be shown off!
Share a photo of your home in its Christmassy glory and be in to win a spot prize. Some of these entries will be chosen as a finalist for the grand title of NZ's Merriest Home which Neighbourly members can vote on!
Entries close Sunday, 15th of December so share a photo today 📸
Neighbourhood Riddle Duel: Who Will Guess First?
There are three playing cards in a row. Can you name them with these clues?
There is a two to the right of a king.
A diamond will be found to the left of a spade.
An ace is to the left of a heart.
A heart is to the left of a spade.
Now, identify all three cards.
Do you think you know the answer to our daily riddle? Don't spoil it for your neighbours! Simply 'Like' this post and we'll post the answer in the comments below at 2pm.
Want to stop seeing riddles in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.
International Volunteer Day - 5th December 2024
This International Volunteer Day on December 5th, we want to take a moment to celebrate the incredible people who give their time, energy, and hearts to help others. The theme this year 𝐒𝐨𝐦𝐞𝐭𝐡𝐢𝐧𝐠 𝐟𝐨𝐫 𝐄𝐯𝐞𝐫𝐲𝐨𝐧𝐞 reminds us that volunteering comes in all shapes and sizes, and there’s a way for everyone to contribute.
Volunteering though isn’t just about one day, it happens every single day, in big ways and small. To everyone who steps up to lend a hand, support their community, or just make someone’s day brighter, thank you.