Back
746 days ago

Dunedin's new mayor moves to reinstate famous St Clair beach poles after heavy swells washed them away

Nicole Mathewson Reporter from Dunedin News

From reporter Hamish McNeilly:

The tide may have turned for the Dunedin’s famed St Clair beach poles.

In June, heavy swells stripped sand from the popular city beach, exposing coastal defences in the form of giant sand sausages, and leaving a solitary pole remaining – before that too was destroyed.

Those poles once formed part of a groyne – a series of poles embedded in the sand and designed to trap sand – first installed 120 years ago.

Reinstating the groynes to assist with coast erosion was a pet project of former councillor Jules Radich. Now he’s the mayor, and the Dunedin City Council is preparing to vote to have them reinstated.

Radich’s motion to reinstall a groyne at St Clair on a five-year trial basis was rejected by the last council at a June meeting.

Prior to that vote he told Stuff he did not have the numbers, and “the only blockage to this is political”.

Fast-forward five months and Mayor Radich is likely to have the numbers, when the matter is again discussed at a council meeting on November 8.

That motion that council: ‘’Requests an urgent report on the cost and time frames for reinstating the St Clair groyne, potentially on a trial basis’’, was signed by the mayor and five other councillors.

An online poll, backed and promoted by Radich, to reinstate the wooden poles had attracted thousands of signatures.

The council’s St Clair- St Kilda Coastal Plan was adopted in February. That short-term walk includes improving access, removing redundant infrastructure, and dune stability work.

In an effort to retain sand at the beach, a groyne or a similar structure designed to trap sand, could be constructed.

‘’This could create an enhanced high tide beach. It would require ongoing investments to top-up and sustain sand levels over longer periods,’’ the plan said.

A 2019 council report concluded a groyne would help retain sand on one side, but reduce sand on the other.

To be effective, a groyne at St Clair would need to be at least 65m long.

Another council report, this time in 2020, estimated the cost to construct a timber groyne at $150,000, with additional maintenance costs.

Image
More messages from your neighbours
30 minutes ago

The Neighbourhood’s Brainiest: Can YOU Solve Today’s Riddle?

Riddler from The Neighbourly Riddler

You see a boat filled with people.
It has not sunk, but when you look again you don’t see a single person on the boat.
Why?

Do you think you know the answer to our daily riddle? Don't spoil it for your neighbours! Simply 'Like' this post and we'll post the answer in the comments below at 2pm.

Want to stop seeing riddles in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.

Image
30 minutes ago

Ryman’s Walk in Wednesdays

The Team from Ryman Healthcare

Ryman villages across the country are open every Wednesday in November.

Experience the Ryman lifestyle and learn about our living options, tour our showhomes and discover the wonderful amenities on offer.

Click to find out more information.
Find out more

Image
30 minutes ago

This week's prize winners!

The Team from Neighbourly.co.nz

Congrats to the winners of the $100 Grocery vouchers:

Lynette Baker from Palmerston North
Maurice Higgs from Nelson
Rafael Laverde from Miramar
Janet Atkinson from Masterton

If you're a winner, get in touch here before 26th November.

Not a winner this week? There's always next week!

Image