Permanent zebra-crossing to be installed on Vine Street
We're installing a permanent zebra-crossing on Vine Street in the central city.
The temporary "courtesy crossing" has created a better link to the city from the bus hub and car park, as well as reducing speeding and letting people cross the road more safely. Now Vine Street is booming - the shop-fronts are near full occupancy and whether it's baking, gyms, op shops or something else, there are plenty of reasons to visit. You can also wander through The Strand arcade or Quality Street to access Cameron Street and the central city, and the foot-traffic is great for the many small businesses that have set up in the area.
The construction work starts on 13 May 2024 and will take about 3 weeks. At times during construction, Vine Street will be reduced to one-lane with stop/go control.
Best way to use leftovers?
I'm sure you've got some excess ham at home or cold roast potatoes.
What are some of your favourite ways to use leftover food from Christmas day? Share below.
Fair play
Whether it’s a playhouse, she shed or teenager’s sleepout, a stencil-painted floor in Resene Clockwork Orange will elevate it from meh to wow. Find out how to create your own with these easy step by step instructions.