Back
113 days ago

‘No clear direction’: Schools await fate of building projects

Nicole Mathewson Reporter from The Press

By David Hill, Local Democracy Reporter

Crunchtime is fast approaching for two North Canterbury schools bulging at the seams.

Woodend School and Te Kura o Tuahiwi are on the Ministry of Education’s list of 352 building projects under review.

The review is not expected to be completed until July.

Te Kura o Tuahiwi, a Māori immersion and bilingual school between Kaiapoi and Rangiora, was due to receive five new classrooms and a new hall, with building set to begin last December and be completed next month.

But it was delayed and is now on hold, pending the review.

Principal Dot Singh said the project was designed to take the school’s capacity to 230 students.

For the now school is sitting at its present capacity of 160, with another 33 pupils pre-enrolled to start later this year.

‘‘Now we are wondering where we will put all of those tamariki.

‘‘I feel they (the ministry) will come to the party in some form, it just might not be how we planned it.’’

Woodend School principal Andrew Retallick said his roll was continuing to grow faster than anticipated.

‘‘As off today we have 480 students enrolled, so now it is looking like we will have have at least 520 by the end of the year.

‘‘I’ve had 70 students enrol so far this year and we have 50 year 8s leaving at the end of the year, so it shows you how much we are growing.’’

The site’s capacity is about 490 and by using the school library as a classroom, Retallick said the school could cater for around 510 students.

The school’s growth comes on the back of the booming Ravenswood subdivision.

‘‘The toughest part is the uncertainty and having no clear direction, but I can’t do anything about it until I get some direction from the ministry,’’ he said.

Schools around the country are feeling the pressure while they wait for an update from the Ministry of Education’s review.

Education Minister Erica Stanford announced an inquiry in February, which immediately put the brakes on the projects.

At the time, Stanford said the scope of the building works were ‘‘unrealistic and unaffordable’’.

Ministry of Education Te Tai Runga (South) Hautū (leader) Nancy Bell said there were no updates on the North Canterbury building projects.

‘‘We continue to work closely with the schools in our planning to deliver roll growth teaching spaces to accommodate the schools’ in-zone rolls as required.’’

■ LDR is local body journalism co-funded by RNZ and NZ On Air.

More messages from your neighbours
4 days ago

Poll: Should drivers retake the theory test every 10 years?

The Team from Neighbourly.co.nz

Drivers get where they need to go, but sometimes it seems that we are all abiding by different road rules (for example, the varying ways drivers indicate around a roundabout).
Do you think drivers should be required to take a quick driving theory test every 10 years?

Vote in the poll and share any road rules that you've seen bent! 😱

Image
Should drivers retake the theory test every 10 years?
  • 49.2% Yes
    49.2% Complete
  • 48.9% No
    48.9% Complete
  • 1.9% Other - I'll share below
    1.9% Complete
2721 votes
2 hours ago

Stand out

The Team from Resene ColorShop Rangiora

Keep your houseplants on trend with colourful pots and timber frames finished in Resene Colorwood Natural. Find out how to create your own with these easy step by step instructions.

Image
3 hours ago

Rangiora school’s Te Whare Mātauranga aims to boost arts, culture

Nicole Mathewson Reporter from The Press

By David Hill, Local Democracy Reporter

Rangiora High School is investing in arts and culture with a new learning whare, as the principal looks to support a growing community.

The school’s much anticipated Te Whare Mātauranga (house of learning) is due to open in term four, while a community performing arts centre is also proposed.

The Government has told schools to focus on literacy and numeracy, but acting principal Remihana Emery, himself a maths teacher, said there was still merit in arts and culture.

The $1.2 million, multi-purpose Te Whare Mātauranga is being fully funded by the school’s board of trustees.

‘‘The whare is waiting on some minor things to be completed and we are hoping to open it in term four,’’ Emery said.

‘‘It is a great investment for the school and the community.’’

The 171 square metre whare has an ‘‘imposing’’ frontage, and will be used for cultural and community events.

It will have a multi-use cultural and teaching space equivalent to 1.5 classrooms, a wet room / dining space and a huge 51m2 north-facing verandah.

The teaching space will be big enough for 35 students.

As an auditorium, it will seat 65 people, while 30 could be seated in the dining room.

The whare is located on Wales St at the northwest corner of the school grounds, facing Mt Grey.

Board of trustees presiding member Simon Green said the school worked closely with Te Ngāi Tūāhuriri Rūnanga in planning the whare.
‘‘We are really pleased with how it is coming along.

‘‘Our intention is for every student to spend time in the building during the year and to understand the significance of it.’’

He said the school’s Māori department will move into the new whare building, which will mean moving it back on to the main site rather than being housed in an old prefab across the road.

A sub-committee has been formed to develop a proposed 800-seat performing arts centre / auditorium which is likely to cost $10-12 million.

■ LDR is local body journalism co-funded by RNZ and NZ On Air.

Image