Back
1924 days ago

How to be safe in NZ ? Migrant Connect Information Session

Citizens Advice Bureau from Citizens Advice Bureau Upper Hutt

Next Monday 24th June, 1pm we are running the rescheduled Migrant Connect Information Session “How to be safe in NZ”. Phil Pithyou, Ethnic Liaison officer from NZ Police will be presenting.
It will be in the Learning Centre at Upper Hutt Library (The walled off area on left as you come in the main door, where the projector is). Refreshments provided.

Image
More messages from your neighbours
15 hours ago

Take a little moment out of your day to solve this mystery minute!

Riddler from The Neighbourly Riddler

I have no life, but I can die. What am I?

Do you think you know the answer to our daily riddle? Don't spoil it for your neighbours! Simply 'Like' this post and we'll post the answer in the comments below at 2pm.

Want to stop seeing riddles in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.

Image
2 days ago

Poll: How do you feel about dogs being allowed indoors in cafes?

The Team from Neighbourly.co.nz

For most of us, seeing a friendly doggo while out and about instantly brings a smile to our faces. But how do you feel about cafes welcoming pups inside?

Cast a vote and share your thoughts below.

Image
How do you feel about dogs being allowed indoors in cafes?
  • 27.6% I love it!
    27.6% Complete
  • 31.5% Only in designated areas
    31.5% Complete
  • 41% No, it should be outdoors only.
    41% Complete
1945 votes
2 hours ago

PANIC OVER FOR PANASONIC

Michael from Trentham

Blue Mountains Campus in Wallaceviĺle is snail pacing its tenancy but not by design.
The Panasonic regional office is relocating to the campus which brings the tenancy to four.organisations plus a cafe.

It has been expected that TransDec would relocate a lot of its operation from Wellington Railway Station to BMC .but maybe financial restraints have derailed the move.

Meanwhile stages 2 and 3 of the campus have been put back perhaps a year or two for completion.