New traffic management in place on Seaview Road
As part of the Barber Grove wastewater pipe renewal works, Wellington Water is constructing a new trench on Seaview Road.
As a result, there will be new traffic management in place, from Monday, November 21.
The road will be reduced to one lane on each side from 8 Seaview Road through to the Petone Z Petrol Station just before the Seaview roundabout.
Please follow all onsite signage and take care with merging.
The existing bus stop will be temporarily relocated to the south of the site. Cyclists and pedestrians will be escorted through site. There is no change to the Urupa carpark access.
Traffic management will be in place until late March 2023.
The hours of work will generally be 7am – 6:30pm Monday to Friday, with some Saturday work as required
Poll: When should the tree go up? 🎄
From what we've heard, some Christmas trees are already being assembled and decorated.
What are your thoughts on the best time to get your Christmas tree up?
-
4.7% Second half of November
-
43.4% 1st December
-
17.6% A week before Christmas
-
33.2% Whenever you wish
-
1.1% Other - I'll share below
Poll: Should all neighbours have to contribute to improvements?
An Auckland court has ruled a woman doesn’t have to contribute towards the cost of fixing a driveway she shares with 10 neighbours.
When thinking about fences, driveways or tree felling, for example, do you think all neighbours should have to pay if the improvements directly benefit them?
-
82.9% Yes
-
14.3% No
-
2.8% Other - I'll share below
What's your favourite tomato recipe?
Kia ora neighbours. We know your tomato plants are still growing, but we're looking ahead to the harvest already! If you've got a family recipe for tomatoes, we'd love to see it and maybe publish it in our magazine to share with our readers. Send your recipe to mailbox@nzgardener.co.nz, and if we use it in the mag, you will receive a free copy of our February 2025 issue.