Odour from wastewater treatment plant could last months, council says
Odours wafting from the fire-damaged wastewater treatment plant in the east of Christchurch could last for months, the council says.
One month after a fire ripped through the roofs of the two big trickling filters at the Bromley wastewater plant on November 1, an investigation into the cause of the blaze is still continuing.
The unpleasant smell wafting from the treatment plant could “unfortunately last for some time,” the Christchurch City Council said in a statement.
The odour would continue until the treatment biomass was healthy, and it could take several months for the biomass to regrow, it said. Continue reading here.
Unlock Your Inner Detective: Today’s Riddle Awaits!
What gets wet while drying?
Do you think you know the answer to our daily riddle? Don't spoil it for your neighbours! Simply 'Like' this post and we'll post the answer in the comments below at 2pm.
Want to stop seeing riddles in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.
Is your drainage system earthquake damaged?
Enviroflo are discovering widespread damage in ceramic drains across the Canterbury region - often there are no obvious signs.
Let our experienced team take care of it. We'll diagnose the damage, provide a report and work with the Natural Hazards Commision (formally EQC) on your behalf.
Book your free check today! Call 03 242 0828 or 020 4 DRAINS. Terms and conditions apply
Poll: When should the tree go up? 🎄
From what we've heard, some Christmas trees are already being assembled and decorated.
What are your thoughts on the best time to get your Christmas tree up?
-
5% Second half of November
-
44.1% 1st December
-
17.1% A week before Christmas
-
32.4% Whenever you wish
-
1.3% Other - I'll share below