Sel-Peacock Ave, Buscomb Ave (New Roundabout) Will Traffic Get Worse or Better? You Decide
What do people think of the new roundabout that AT are putting in the top of Sel Peacock Ave-Buscomb Ave?
Do you think the traffic will get better or get worser off?
Here is the link if anyone is interested?
at.govt.nz...
I'll also post the info here too.
Consultation status: closed 9 August 2017
Proposal reference: TOW1718-011
We are proposing to:
Install a new mini roundabout including associated give way and flush median road markings.
Install four new splitter islands including new signage on the approach to the roundabout.
Install new a pram crossing and refuge island with tactile pavers and build a widened footpath access on the west and south approach to the roundabout on Sel Peacock Drive.
Install kerb extensions with a grass berm on the north-east corner (outside #13) and the south-west corner (outside #10) of the intersection.
Removal and conversion of several pram crossings to footpath at intersection.
Removal of parking outside #13 (1 space), outside #8 (2 spaces) and opposite #10 (4 spaces) on Buscomb Avenue.
Why the changes are needed
There have been many crashes occurring at this intersection due to vehicles not stopping and also confusion over who is required to give way from Buscomb Avenue.
The mini-roundabout proposed with new pedestrian refuges will encourage lower speeds and simplify the give way priority and turning movements resulting in a lower frequency and severity of crashes at this intersection. Parking has also been removed in order to improve visibility for pedestrians at the pram crossings.
Traffic and pedestrian surveys have been completed and are available on request.
Feedback
The proposal received positive feedback with some concerns raised by respondents. After reviewing this feedback and all other supporting evidence, the proposal will proceed without changes to the next stage of detailed planning.
Specific feedback and proposed solution
Installation of a speed hump would be beneficial to slowing down traffic entering Buscomb Ave from Great North Rd. This issue has been taken on board and will be investigated separately.
Next steps
We expect to introduce this work in the 2017/18 financial year, subject to any further changes in design or funding issues.
Contractors will notify all residents in the area 48-hours prior to starting construction work.
Matt
sel-peacock-dr-buscomb-ave-consultation-drawing.pdf Download View
It’s Riddle Time – You Might Need an Extra Cup of Coffee!
Nobody has ever walked this way. Which way is it?
Do you think you know the answer to our daily riddle? Don't spoil it for your neighbours! Simply 'Like' this post and we'll post the answer in the comments below at 2pm.
Want to stop seeing riddles in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.
Need Event Medical Cover?
MRI provides modern medical solutions for a wide range of events and industries. From local sporting or community events - to large concerts and major festivals - we can provide tailored and professional medical cover that suits your needs.
Our experienced team of clinicians and operations managers can provide a complete risk assessment of your event and advise you on the most suitable medical expertise to have on site.
Get in touch with the team today at info@mri.nz
What's your favourite recipe for courgettes?
Kia ora neighbours. If you've got a family recipe for courgettes, we'd love to see it and maybe publish it in our magazine. Send your recipe to mailbox@nzgardener.co.nz, and if we use it in the mag, you will receive a free copy of our January 2025 issue.