Miramar, Wellington

B
1768 days ago

Egg Cartons

Brenda from Seatoun

Someone was wanting egg carton a while back and I now have a very large bag full of them if anyone needs them for seedlings etc. Can drop off if you live in Eastern Suburbs . 0274303641

Free

G
1782 days ago

Nos12 & 12e Strathmore Park bus route & timetable changes

Glenn from Strathmore Park

From 26th January selected No 12's will travel through Miramar, Kilbirnie and Newtown past the Hospital to the Hutchison terminus (near Toi Whakaari & Junglerama - old "Winter Show" building)
These are weekday only buses leaving Kekerenga St. at 9am,10am,11am, 12mid,1pm & … View more
From 26th January selected No 12's will travel through Miramar, Kilbirnie and Newtown past the Hospital to the Hutchison terminus (near Toi Whakaari & Junglerama - old "Winter Show" building)
These are weekday only buses leaving Kekerenga St. at 9am,10am,11am, 12mid,1pm & 2pm. All other No.12 buses leaving Kekerenga (including those leaving on the 1/2 hr during the above times) will travel only to Kilbirnie.
Return from Hutchison to Kekerenga will be on the 1/2 hr from 9:30,10:30,etc to 2:30pm. These are timed to be leaving Kilbirnie 8 mins later. All other No.12's will leave only from Kilbirnie
Peak hours No.12e's will continue to run via the Hataitai tunnel to town.
Pickup a timetable from Snapper stores or download from the Metlink site.
Courtesy Strathmore Park Residents Association Inc.

1781 days ago

How’s my network?

Community Engagement Advisor from

From Sunday 26 January 2020, Metlink will have some refreshed bus timetables.
Metlink’s Wellington network will be under pressure at this time of year, therefore you might not get your first choice of bus during morning peak. Know before you go. Ensure you are prepared with a back-up plan if you… View more
From Sunday 26 January 2020, Metlink will have some refreshed bus timetables.
Metlink’s Wellington network will be under pressure at this time of year, therefore you might not get your first choice of bus during morning peak. Know before you go. Ensure you are prepared with a back-up plan if you need to be somewhere urgently.

You deserve a reliable bus network and we’re working hard to make that happen. We are refreshing some timetables based on passenger boarding data to lay a solid foundation to build on, match available driver and bus resources due to the ongoing national driver shortage and work to improve reliability. Check what’s happening in your area by visiting www.metlink.org.nz...

We apologise if you’re affected by any disruption to your service. Stay up-to-date by subscribing to My Metlink, download the Metlink app or call the team on 0800 801 700. You can also follow us on Facebook and Twitter.

#Knowbeforeyougo #Metlinkbuses #bustimetables

1771 days ago

MOA POINT SLUDGE UPDATE

The Team from Wellington Water

The trucking operations that have been operating this week, continue to prevent sludge from being discharged into the Cook Strait. The alternative operation means trucks on 24 hour rotation collect the wastewater treatment byproduct at the Moa Point Treatment Plant, taking it to the landfill at … View moreThe trucking operations that have been operating this week, continue to prevent sludge from being discharged into the Cook Strait. The alternative operation means trucks on 24 hour rotation collect the wastewater treatment byproduct at the Moa Point Treatment Plant, taking it to the landfill at Carey’s Gully.

The operation was today refined by reducing the amount of trucks on the road and splitting them into two shifts of 6-7 trucks each. These trucks are continuing to keep up with demand, and are operating efficiently.

The fault in the pipeline was located yesterday, and we are continuing to plan a repair with a temporary bypass, as well as a long term fix. The location appears to be about 200m inside the tunnel under Mt Albert.

We are working with the local community at Moa Point, and are holding a community meeting on Sunday to update them on the project and address any concerns residents may have.

We will provide further update on Monday 27 January.

1770 days ago

Help build a stronger, safer Aotearoa

Fire & Emergency NZ

Do you have strong links into your community? Can you represent a wide range of people? We want to hear from you.

We’re looking for people for our new Local Advisory Committees, who can offer insight into what matters to your community.

Nominate yourself or someone you know today.
Learn more

Image
1771 days ago

A young life changed

Graeme Dingle Foundation

An 11-year-old Bay of Plenty boy may look like an ordinary child, but the challenges he has faced and the struggles he’s overcomes set him apart from the crowd.

Image
1771 days ago

Bus stop closures on Route 23 due to resurfacing work at Manchester Street

Community Engagement Advisor from

Due to resurfacing work on a section of Manchester Street, Melrose from Caprera Street to Rodrigo Road, Bus Route 23 will be diverted. This resurfacing work will affect the following bus stops resulting in their closure from Tuesday 28 January to Thursday 30 January during 9am to 3pm each day.

View more
Due to resurfacing work on a section of Manchester Street, Melrose from Caprera Street to Rodrigo Road, Bus Route 23 will be diverted. This resurfacing work will affect the following bus stops resulting in their closure from Tuesday 28 January to Thursday 30 January during 9am to 3pm each day.

Affected bus stops are:
Stop #6925 Manchester Street at Caprera Street
Stop #7925 Manchester Street opposite Caprera Street
Stop #6924 Wellington Zoo Stop B, Stop #7924 Wellington Zoo Stop A
Stop #6922 Mansfield Street at Roy Street (near 311)
Stop #7922 Mansfield Street (near 320)
Stop #6921 Mansfield Street at Horner Street

Due to the closure Metlink will have a shuttle bus operating from Hornsey Road through to Rodrigo Road and back, performing a loop service for customers living in Melrose.

The shuttle will mirror the Route 23 frequency and will drop off / pick up customers from Stop #7931 on Houghton Bay Road at Hornsey Road and Stop #6931 on Houghton Bay Road at Hornsey Road (near 57) enabling you to then board the Route 23 bus.

Know before you go. Plan ahead and allow extra time for your journey during work hours during these dates.

For more information visit: www.metlink.org.nz...

Keep up-to-date with what is happening on your network by subscribing to MyMetlink, downloading the Metlink Commuter App or calling 0800 801 700.

#Knowbeforeyougo #metlink

Image
A
1771 days ago

Stinky

Angie from Miramar

What the heck is that smell 😂on Broadway and smelt several times this week

1771 days ago

Make your own outdoor ottoman

The Team from Resene ColorShop Kilbirnie

Need somewhere to put your feet up when relaxing outside out can’t find anything to suit your place?

Why not create your own ottoman like this one made out of an old car tyre and paint it in a Resene colour to match your colour scheme.

Make the most of this weekend with this … View more
Need somewhere to put your feet up when relaxing outside out can’t find anything to suit your place?

Why not create your own ottoman like this one made out of an old car tyre and paint it in a Resene colour to match your colour scheme.

Make the most of this weekend with this easy step by step project idea from Resene. Follow these easy step by step instructions to create your own.

Image
1771 days ago

Peter Matcham - - Whaitua Te Whanganui-a-Tara Committee

Community Engagement Advisor from Greater Wellington Regional Council

Kia ora koutou, I’m Pete, a member of the Whaitua Te Whanganui-a-Tara Committee tasked with making recommendations to Greater Wellington Regional Council on the future of our coastal and freshwater quality, and how our water is used. Our waterways and all the fish and species that live in them … View moreKia ora koutou, I’m Pete, a member of the Whaitua Te Whanganui-a-Tara Committee tasked with making recommendations to Greater Wellington Regional Council on the future of our coastal and freshwater quality, and how our water is used. Our waterways and all the fish and species that live in them are precious taonga, so we have set out to understand how they are valued and what should be done to provide the future we want for our water.

My wife and I have been living at the edge of Belmont Park for over 30 years and I consider it my responsibility to pass on a sustainable healthy catchment to my grandchildren. We can’t do this alone and need your help in protecting the health and mauri of our water.
Increasing population and changing land use is putting pressure on our water, from our rivers and streams to the supply of drinking water, and management of storm and waste water. Fixing these problems is going to cost a lot, and we need to find solutions that are fair and equitable based on sound evidence and knowledge.

To do this we need to understand your views and to work with you and your community. Let’s shape the future of this place and our precious freshwater together.

Connect with us to talk about what we can do together. You can reach us at whaitua@gw.govt.nz. To see what we have been doing visit our Facebook page, and to share what you value about our water and your solutions have your say down below.

Image
1771 days ago

Anya Pollock - Whaitua Te Whanganui-a-Tara Committee

Community Engagement Advisor from Greater Wellington Regional Council

Kia ora koutou, I am Anya from Karori, a member of Greater Wellington Regional Council’s Whaitua Te Whanganui-a-Tara Committee tasked with making recommendations to Greater Wellington Regional Council on the future of our coastal and freshwater quality, and how our water is used. Our waterways … View moreKia ora koutou, I am Anya from Karori, a member of Greater Wellington Regional Council’s Whaitua Te Whanganui-a-Tara Committee tasked with making recommendations to Greater Wellington Regional Council on the future of our coastal and freshwater quality, and how our water is used. Our waterways and all the fish and species that live in them are precious taonga, so we have set out to understand how they are valued and what should be done to provide the future we want for our water.

The Karori Stream that flows through my backyard serves as a reminder to me every single day on the importance of making our waterways healthy. We need your help in protecting the health and mauri of our waterways, which are under pressure from increasing population. We need solutions that require real change in the way we interact with water if we want it to be safe for our kids. And we need to think long-term about how and who pays for these solutions.

Connect with us to talk about what we can do together. You can reach us at whaitua@gw.govt.nz. To see what we have been doing visit our Facebook page, and to share what you value about our water and your solutions have your say by following the link below.

Image
L
1771 days ago

Wellington East Uniform

Liz from Karaka Bays

Blazer size 16 excellent condition
White Blouses various sizes 12 to 16 various conditions
Jersey okay but cuff needs darning as home in it
Tie excellent condition
Welcome to try on

Price: $120

Image
1772 days ago

MOA POINT SLUDGE UPDATE

The Team from Wellington Water

Trucking operations are continuing as an alternative to the sludge pipeline between Moa Point Treatment Plant and the landfill at Carey’s Gully.

Investigations have located the point of failure and work is under way to plan a repair with a temporary bypass, as well as a long term fix. It will be… View more
Trucking operations are continuing as an alternative to the sludge pipeline between Moa Point Treatment Plant and the landfill at Carey’s Gully.

Investigations have located the point of failure and work is under way to plan a repair with a temporary bypass, as well as a long term fix. It will be a complex job, because wastewater also flows within the tunnel towards Moa Point, making for dangerous working conditions.

With the pipeline out of action, there is a risk that if the trucking option is interrupted for 24 hours or more, some sludge may need to be discharged via the long outfall pipe that carries treated wastewater out to Cook Strait. Trucks are currently keeping up with daily demand, however as the landfill and treatment plant weren’t designed to manage sludge from trucks, there remains a risk that we may have to discharge sludge from the outfall.

When the plant was built, the intended alternative to pumping sludge to the landfill in the event of a significant failure was to discharge it via the long outfall. Public expectations have changed since then however, and Wellington Water and teams of contractors are making every effort for this not to happen.

Top