Hokitika coastal protection project to push on
By local democracy reporter Brendon McMahon:
The Hokitika seawall extension project is to be pushed ahead despite the West Coast Regional Council not having any money yet to build it.
The northern extension to the 2013-built Hokitika Seawall has been in the pipeline for the past two years under council's Infrastructure Resilience Group 'shovel ready' programme for the town.
The programme includes the three stage Hokitika River stopbank programme on the southern edge of Hokitika, now at its second stage and awaiting final sign off by KiwiRail.
On Wednesday, the council announced it will drive forward its goal of providing better long-term coastal protection for the Hokitika residential area along the Revell Street-north beachfront.
Council chairperson Peter Haddock said they hope council can win some of the new 'shovel ready' money, set aside in the Coalition Government deal with NZ First, to build the extension.
But a requirement for the new money is the consent application is lodged to ensure no subsequent delay to what are supposed to be 'shovel ready' projects.
Haddock warned council is contesting for an annual pool of about $100m of funding nationwide.
"The priority for the Government will be that the projects are all ready to go because in the past a lot of projects that were 'shovel ready', weren't ready."
Haddock said council has applied knowing it will need to show it has the consent in train to qualify.
"It is in one of the tranches for funding. We have put that up for the Hokitika seawall, however it will depend on priorities around the country."
The new consent application encompassed future sea protection emergency work, a retrospective emergency work provision for the current 2013 seawall, and consent for the proposed extension.
Haddock said the emergency provision would allow council to be more proactive in the face of a future extreme event.
At the same time he expected some pushback from residents in the seawall extension area who stood to lose easy beach access from their properties.
"It will be contentious."
The township, founded in 1864, has a long history of inundation with the sea flooding the CBD within living memory.
Haddock said they hoped to have a formal hearing by about September - dependent on the availability of commissioners.
Council natural hazards analyst Dr Sharon Hornblow said Hokitika's natural hazard exposure is clear as it is built "within a dynamic coastal environment".
"Erosion issues are part of a long-term balance between sediment supply and highly active coastal processes," she said.
In particular the Hokitika shoreline is in a state of "dynamic equilibrium" balancing sediment supply from the river and earthquake induced landslides, with coastal bars and erosion troughs impacted by flood flows and storms.
Hokitika's seismic location between the Alpine Fault and the offshore Cape Foulwind Fault meant vertical land movement, along with sea level rise, is a future consideration, Hornblow said.
Council had decades of coastal erosion monitoring data, with the most recent data from 2021 showing "the potential" for river and storm surge flooding.
"Future projections for the Hokitika shoreline are more frequent severe flood events, coastal storms, future sea level rise from measured temperature increases and ice melt, and further sediment transport as well as coastal erosion," Hornblow said.
Extending and completing a new sea wall presented "a proactive short to medium-term option".
Hornblow said it would potentially help mitigate the ongoing impacts of sea level rise and the increased coastal hazard exposure while council worked towards a longer-term strategy for the area.
What's your favourite tomato recipe?
Kia ora neighbours. We know your tomato plants are still growing, but we're looking ahead to the harvest already! If you've got a family recipe for tomatoes, we'd love to see it and maybe publish it in our magazine to share with our readers. Send your recipe to mailbox@nzgardener.co.nz, and if we use it in the mag, you will receive a free copy of our February 2025 issue.
Live Q&A: Garden maintenance with Crewcut
This Wednesday, we're having another Neighbourly Q&A session. This time with John Bracewell from Crewcut.
John Bracewell, former Black Caps coach turned Franchisee Development Manager and currently the face of Crewcut’s #Movember campaign, knows a thing or two about keeping the grass looking sharp—whether it’s on a cricket pitch or in your backyard!
As a seasoned Crewcut franchisee, John is excited to answer your lawn and gardening questions. After years of perfecting the greens on the field, he's ready to share tips on how to knock your garden out of the park. Let's just say he’s as passionate about lush lawns as he is about a good game of cricket!
John is happy to answer questions about lawn mowing, tree/hedge trimming, tidying your garden, ride on mowing, you name it! He'll be online on Wednesday, 27th of November to answer them all.
Share your question below now ⬇️
Poll: When should the tree go up? 🎄
From what we've heard, some Christmas trees are already being assembled and decorated.
What are your thoughts on the best time to get your Christmas tree up?
-
4.6% Second half of November
-
43.5% 1st December
-
17.5% A week before Christmas
-
33.3% Whenever you wish
-
1.1% Other - I'll share below